×
neos-pseudoapplication-83
Type: | Model Group |
Submitter: | NEOS Server Submission |
Description: | Imported from the MIPLIB2010 submissions. |
Parent Model Group (neos-pseudoapplication-83)
All other model groups below were be compared against this "query" model group.![]() ![]() |
![]() |
Model Group Composite (MGC) image
Composite of the decomposed CCM images for every instance in the query model group.
|
Component Instances (Decomposed)
These are the decomposed CCM images for each instance in the query model group.![]() ![]() |
These are component instance images.
|
![]() |
![]() |
![]() |
![]() |
![]() |
Name | neos-3754224-navua | neos-3594536-henty | neos-619167 |
MIC Top 5 Model Groups
These are the 5 MGC images that are most similar to the MGC image for the query model group, according to the ISS metric.![]() ![]() |
FIXME - These are model group composite images.
|
![]() |
![]() |
![]() |
![]() |
![]() |
Name | blp | neos-pseudoapplication-36 | neos-pseudoapplication-69 | rail0 | c1s1 | |
Rank / ISS
The image-based structural similarity (ISS) metric measures the Euclidean distance between the image-based feature vectors for the query model group and all other model groups. A smaller ISS value indicates greater similarity.
|
1 / 1.449 | 2 / 1.757 | 3 / 1.762 | 4 / 1.877 | 5 / 1.918 |
Model Group Summary
The table below contains summary information for neos-pseudoapplication-83, and for the five most similar model groups to neos-pseudoapplication-83 according to the MIC.
MODEL GROUP | SUBMITTER | DESCRIPTION | ISS | RANK | |
---|---|---|---|---|---|
Parent Model Group | neos-pseudoapplication-83 | NEOS Server Submission | Imported from the MIPLIB2010 submissions. | 0.000000 | - |
MIC Top 5 | blp | M. Lübbecke | Railway line planning model. Solved using CPLEX 12.3 (12 threads) on an Intel Xeon X5650 @ 2.67GHz, 12MB cache, 24GB RAM in 4947.5 sec.\xa0Solved using Gurobi 4.6.1 (12 threads) in 1867.9 sec. | 1.448535 | 1 |
neos-pseudoapplication-36 | Jeff Linderoth | (None provided) | 1.756546 | 2 | |
neos-pseudoapplication-69 | Jeff Linderoth | (None provided) | 1.762150 | 3 | |
rail0 | Thomas Schlechte | Track allocation problem modeled as arc coupling problem The problem was solved by CPLEX 12.4. It took approximately 170 hours. | 1.876891 | 4 | |
c1s1 | M. Vyve, Y. Pochet | Lot sizing model. | 1.918093 | 5 |